Butt Fusion welding checklist

Butt Fusion welding checklist
  • Trim the pipe ends all the way around
  • Clean the heater plates
  • When clamping the pipes in place, use the clamps to re-round the pipes
  • Correct procedure: Ask for evidence of recent, random weld inspections by your supervisors

Pressure

  1. Measure the drag pressure
  2. Check the right fusion pressure
  3. Add the two together for the overall pressure setting

Temperature

  1. Set the right heater place temperature (usually in the reange of 200-240C
  2. Give enough heat soak time for the pipe ends to fully heat up
  3. Keep dwell time down so the pipe ends don’t cool before contact

Alighnment

  1. Aim for less than 1mm misalignment
  2. For thicker pipes, misalignment must not exceed 10% of the pipe wall thickness (e.g. for 18mm thick pipe, no more thatn 1.8mm)

When you need focused help fast, get it from a supplier whose success is
keeping your plant moving. Call Advanced Piping Systems now on 1300 792 879

Related Articles

How to get the best performance on bends

Training

When considering performance fittings for piping systems, the suitability and type of bend used on a project is essential to its functionality. In this article …

Polly Welding Training & Accreditation

Training

As Australia’s specialist supplier of PE fittings and piping systems, we recognise the importance of quality and training. At Advanced Piping Systems we offer comprehensive …

Quick tips for successful Electrofusion Jointing of PE pipes and fittings

Electrofusion Welding

One of the most common challenges we see in the field is ensuring successful electrofusion jointing of PE systems. Installations can be challenging, sometimes due …

The RCM series, Part Two: Seeing failure from four different angles, and measuring the value of avoiding it

Training

Our reliability-centred maintenance (RCM) series continues with a close-up look at failure. If you’re wondering how we got here, check Part One’s introduction to RCM and how …